Safety Emporium eyewashes
Safety Emporium eyewashes

Interactive Learning Paradigms, Incorporated

DCHAS-L Discussion List Archive

About This Archive  |   DCHAS-L 2019 Index   |   DCHAS-L Yearly Index   |   DCHAS-L Home Page

About This Archive

DCHAS-L 2019 Index

DCHAS-L Yearly Index

DCHAS-L Home Page


Previous by Date

Subject: Re: [DCHAS-L] Ventilation issues stacking lab

Date: Nov 28, 2019 14:47 UTC

Author: Melinda Box <melinda.box**At_Symbol_Here**GMAIL.COM>

Next by Date

Subject: Re: [DCHAS-L] Ventilation issues stacking lab

Date: Nov 28, 2019 16:37 UTC

Author: Richard Palluzi <000006c59248530b-dmarc-request**At_Symbol_Here**LISTS.PRINCETON.EDU>

From: Peter Zavon <pzavon**At_Symbol_Here**rochester.rr.com>

Subject: Re: [DCHAS-L] Ventilation issues stacking lab

Date: Nov 28, 2019 16:22 UTC

Reply-To: ACS Division of Chemical Health and Safety <DCHAS-L**At_Symbol_Here**PRINCETON.EDU>

Message-ID: 001b01d5a608$086ce0c0$1946a240$**At_Symbol_Here**rochester.rr.com

In-Reply-To:  

Demystify: 

It sounds like you are adding chemistry labs and their ventilation to a building that already contains biology labs and their ventilation.  Biology labs may not have been given quite as robust a ventilation system as chemistry labs would need. Adding on may require substantial upgrades to the exhaust equipment, reassessment of the system’s exhaust points and stack height, and will certainly require careful design by a ventilation engineer who has knowledge of and prior experience with laboratory ventilation.  Do not leave it to the architect, or to just any design engineer.

 

The only issue I can see with stacking both floors on the same system is the need to ensure against backflow where effluent air from one department might be transported into the other department..

 

 

Peter Zavon, CIH
Penfield, NY

PZAVON**At_Symbol_Here**Rochester.rr.com

 

 

From: ACS Division of Chemical Health and Safety [mailto:DCHAS-L**At_Symbol_Here**PRINCETON.EDU] On Behalf Of Alino, Vera
Sent: Wednesday, November 27, 2019 10:52 PM
To: DCHAS-L**At_Symbol_Here**PRINCETON.EDU
Subject: Re: [DCHAS-L] Ventilation issues stacking lab

 

Hi all,

Does anyone know if there are any safety issues/concerns that need to be addressed when sharing a ventilation system of the labs on the first and second floor?  We are in the designing stage of building chemistry labs on the first floor and sharing the ventilation system with the biology labs on the second floor.

 

Any input is greatly appreciated.  Thank you,

Vera Alino

Chemistry Department

Cosumnes River College

Sacramento, CA

 

Previous post  |  Top of Page  |  Next post